Votre navigateur est obsolète !

Pour une expériencenet et une sécurité optimale, mettez à jour votre navigateur. Mettre à jour maintenant

×

Elie EL KHOURY

Ingénieur en Génie des procédés, Informatique et Environnement

Elie EL KHOURY
39 ans
COLOMBES (92700) France
Situation professionnelle
Consultant
Ouvert aux opportunités
CV réalisé sur DoYouBuzz

BOSIET

FALCK

Décembre 2015
BOSIET stands for basic offshore safety induction and emergency training, a course created to assist in meeting the initial onshore safety training, emergency response training and assessment requirements for personnel new to the offshore oil and gas industry.

Process and Environmental Engineering

INPT - Ecole Nationale Supérieure des Ingénieurs en Arts Chimiques Et Technologiques (ENSIACET)

Septembre 2009 à août 2010
Master 2 :
Process and Environmental Engineering, formation in parallel of Engineering degree

Process and Computer Engineer

Institut National Polytechnique Toulouse -ENSIACET

Septembre 2008 à février 2011
Formation Process and Computer Engineer, option: Design and Process Analysis ( CAP)

Chemistry

Lebanese University_ Faculty of science

Septembre 2004 à juillet 2008
Master 1 in Chemistry

Precommissionning Engineer

Technip
Janvier 2015 à août 2016
CDI
Paris
France
  • On substantial completion of construction activities, Contractor mobilizes its commissioning team to initiate pre-commissioning activities in a phased manner.
  • The objective of pre-commissioning is to ensure that the pipeline as well all the facilities have been completed according to the Project Specifications and that commissioning and operation will take place safely and effectively.
  • Also during the pre-commissioning should be verified that all the relevant data with the commissioning of the pipeline has been received and that the commissioning procedure is presented and discussed with all personnel involved.
  • Another important aspect which has to be verified during this procedure is that all the necessary drawings, technical information, and O & M manuals have been received and that the operating plan has been existing .
  • Pre-commissioning may therefore be defined as all the checks that are to be completed prior to commissioning being permitted to commence.
  • In addition of the above information is to update in parallel Icaps logiciel ( Integrated Commissioning and Progress System) in order to commissioning will commence
  • Offshore Rotation since february 2016

Interface Manager

Technip
Mars 2013 à août 2016
CDI
Paris
France
    • Ensuring effective integration of all stakeholders involved with all Development Department activities

    • Ensuring a cost effective integration between different packages/contractors and between surface and subsurface facilities activities

    • Interface responsibility definition
      Technical integrity of interfaces
      Effective interface management and control including their relevant activities, facilitating the traceability of agreements and changes, if any

    • Assuring technical cooperation in the team and with contractors in order to minimize technical and economical risks

    -Leasing with all technical managers in order to assure the alignment and consistency of technical designs

    • Assuring interface status reports (including progress status and identification of concerns and highlight areas)

    -Managing meetings, as necessary, between different contractors in order to reduce technical and economical risks, negotiating the best resolution of interface discrepancy, if any

    • Ensuring that all interfaces of the assigned project are adequately defined and controlled.

    -Supporting the preparation of the field development strategy, the risk register and the relevant mitigation strategy to address identified uncertainties.

    • Providing support to establish project procedures and policies in accordance to OPDS handbook.

    -Coordinating the preparation of the necessary certificates to obtain the hand-over to the production department for the assigned project.

    • Coordinating the preparation of detailed project and phases close-out reports for the assigned project.
  • CoGa Project - Replacement of approximately 40 flexible pipelines in platforms in Gabon and Congo. It includes procurement and transportation of flexibles, platform topsides/ riser modifications, topsides spools, onshore fabrication works, marine installation of I-tubes, flexibles, Hot Taps, underwater structures, etc. and commissioning of the lines.
    Execution phase involves numerous offshore platforms and SIMOPS operations.

    My mission is to do the coordination with the vendor and validate the documentation
En savoir +
  • The project with SOLIOS CARBON was the realization of a anodes factory in Saudi Arabia. Anodes are used to make the redox reaction to convert the alumina to aluminum .

    My job is to organize equipment manufacturing priorities (storage silos , racks, conveyors , pipes and ducts) and structures .

    My job includes checking the lists of expeditions structures and nomenclatures isometric

    And the interface and arbitration between the site and the contractors for deliveries and invoicing. This monitoring was done on software that serves as an interface and cooperation between the contractors , the site and offices . It also allows us to even the progress of the project.
En savoir +
  • To do mission with Client
  • First mission is with solios Carbon
  • Second Mission with Technip
  • Third mission with Technip
En savoir +
  • Transesterification of ethyl acetate to butyl acetate :
    • Process design for Rhodia Brazil site
    • Design of equipment ( reactors, adsorbers , distillation columns, ....... )
    • Project Investment Calculation
    • Energy Integration
En savoir +
  • Optimisation de la consommation d'électricité en diminuant l'utilisation de l'eau réfrigérée pour la cristallisation de l'acide acétique sur le site d'onsan:
    • Evaluation du bilan matière et thermique de la production actuelle
    • Développer un outil de simulation sur VBA excel pour reproduire la consommation actuelle en énergie de la production
    • Etude sur les changements de la taille de dimension de l'opération unitaire de cristallisation afin d'optimiser surtout la consommation éléctrique
    • Evaluation du gain sur la consommation d'électricité et gain financier
En savoir +
  • Biomass gasification :
    • Establish material balance and the enthalpy Rizer
    • Sizing of the Rizer in order to realize the gasification
      -Develop a calculation tool on FORTRAN
En savoir +
  • solvent management plan:
    • Establish a mass balance of existing solvents for all workshops of the site.
    • Assess the loss of solvents throughout the site
  • Emissions of VOCs :
    • Establish an assessment of VOCs to determine the emissions of these and compare the standards
En savoir +
  • • lab technician:
    • Chemical analysis : checking the composition of cement, clinker , flour
    • Physical analysis : determination physical properties of all cement : strength, void rate
En savoir +
  • Martial Art
  • Classical Music
  • Detective books
Compétences

Skills

  • Process engineer
  • chemical Enginering
  • Aspen HYSYS
  • Microsoft Offices
  • Engineering
  • Hazop
  • Project Engineering
  • Process Simulation
  • AutoCAD
  • Aspen Plus
  • Process Safety
  • Process Optimization
  • Process Design
  • Calculations
  • Commissioning
  • Gas Processing
  • Equipment Sizing
  • Petroleum
  • Oil & Gas
  • Solid Work

Programs

  • Tools and office software : Microsoft Office- pack and Programming : VBA , C ++, specialized in processes Matlab- Software: Prosim , Prophy , Comsol , Aspen

Language

  • French
  • English
  • Arabic