BOSIET stands for basic offshore safety induction and emergency training, a course created to assist in meeting the initial onshore safety training, emergency response training and assessment requirements for personnel new to the offshore oil and gas industry.
On substantial completion of construction activities, Contractor mobilizes its commissioning team to initiate pre-commissioning activities in a phased manner.
The objective of pre-commissioning is to ensure that the pipeline as well all the facilities have been completed according to the Project Specifications and that commissioning and operation will take place safely and effectively.
Also during the pre-commissioning should be verified that all the relevant data with the commissioning of the pipeline has been received and that the commissioning procedure is presented and discussed with all personnel involved.
Another important aspect which has to be verified during this procedure is that all the necessary drawings, technical information, and O & M manuals have been received and that the operating plan has been existing .
Pre-commissioning may therefore be defined as all the checks that are to be completed prior to commissioning being permitted to commence.
In addition of the above information is to update in parallel Icaps logiciel ( Integrated Commissioning and Progress System) in order to commissioning will commence
Ensuring effective integration of all stakeholders involved with all Development Department activities
Ensuring a cost effective integration between different packages/contractors and between surface and subsurface facilities activities
Interface responsibility definition Technical integrity of interfaces Effective interface management and control including their relevant activities, facilitating the traceability of agreements and changes, if any
Assuring technical cooperation in the team and with contractors in order to minimize technical and economical risks
-Leasing with all technical managers in order to assure the alignment and consistency of technical designs
Assuring interface status reports (including progress status and identification of concerns and highlight areas)
-Managing meetings, as necessary, between different contractors in order to reduce technical and economical risks, negotiating the best resolution of interface discrepancy, if any
Ensuring that all interfaces of the assigned project are adequately defined and controlled.
-Supporting the preparation of the field development strategy, the risk register and the relevant mitigation strategy to address identified uncertainties.
Providing support to establish project procedures and policies in accordance to OPDS handbook.
-Coordinating the preparation of the necessary certificates to obtain the hand-over to the production department for the assigned project.
Coordinating the preparation of detailed project and phases close-out reports for the assigned project.
CoGa Project - Replacement of approximately 40 flexible pipelines in platforms in Gabon and Congo. It includes procurement and transportation of flexibles, platform topsides/ riser modifications, topsides spools, onshore fabrication works, marine installation of I-tubes, flexibles, Hot Taps, underwater structures, etc. and commissioning of the lines. Execution phase involves numerous offshore platforms and SIMOPS operations.
My mission is to do the coordination with the vendor and validate the documentation
The project with SOLIOS CARBON was the realization of a anodes factory in Saudi Arabia. Anodes are used to make the redox reaction to convert the alumina to aluminum .
My job is to organize equipment manufacturing priorities (storage silos , racks, conveyors , pipes and ducts) and structures .
My job includes checking the lists of expeditions structures and nomenclatures isometric
And the interface and arbitration between the site and the contractors for deliveries and invoicing. This monitoring was done on software that serves as an interface and cooperation between the contractors , the site and offices . It also allows us to even the progress of the project.
Optimisation de la consommation d'électricité en diminuant l'utilisation de l'eau réfrigérée pour la cristallisation de l'acide acétique sur le site d'onsan:
Evaluation du bilan matière et thermique de la production actuelle
Développer un outil de simulation sur VBA excel pour reproduire la consommation actuelle en énergie de la production
Etude sur les changements de la taille de dimension de l'opération unitaire de cristallisation afin d'optimiser surtout la consommation éléctrique
Evaluation du gain sur la consommation d'électricité et gain financier