Health Safety Security & Environment (HSSE) and Process Safety Engineer in the oil and gas industry, with a good experience in establishing, implementing, maintaining and improving the Process Safety Management System.
The present work is part of a project that is studying a bid to build a power plant near Timimoun in Algeria, a central two-turbine production capacity of 2 * 25 MW and illustrated as part of the rehabilitation performance of the Algerian Society of Electricity Production. Natural gas is the primary fuel while Diesel is a fuel emergency. This part, we will study is the post processing of natural gas before it enters the turbine, it is intended to remove water droplets in the gas and trailed him match the appropriate system for the operation of the turbine. In fact, we tried the technology and equipment suitable to ensure the required task, namely the cyclone separator and coalescing filter to remove water and the water bath heater to heat the gas to the operating temperature of the turbine and to prevent hydrate formation after expansion. Similarly, a simulation software Hysys was made, all equipment has been sized, before finishing with an economic evaluation of the entire post
PIRECO SA, Petroleum and Industrial Realization Contractors est une société privée spécialisée dans les projets industriels clés en main (EPC: Engineering, Procurement and Construction) dans des domaines tels que :
Pétrole et Gaz, Energie et Génération d’énergie, Unités industrielles, Maintenance.