Votre navigateur est obsolète !

Pour une expériencenet et une sécurité optimale, mettez à jour votre navigateur. Mettre à jour maintenant

×

Daniel MARICOURT

Electrical engineer

Intermédiaire Management
Construction
Field Engineering
Commissioning
Maintenance
Daniel MARICOURT
51 years old
Driving License
Vladimir (600024) Russia
Professional Status
Freelancer
Open to opportunities
About Me
More than 29 years experience in EPC or PMC, Electrical Engineering, supervision on different steps of onshore or offshore oil and gas projects (Construction, Pre commissioning, Commissioning, Startup, Maintenance) within an international environment with standards and particular specifications relating to oil and gas contracts; supervision of construction in accordance with high level of safety and technical specifications, quality control with establishing of punch list, management of work permits, establishing of procedures, material management, constitution of pre-commissioning and commissioning files, supervision of pre-commissioning / commissioning activities, follow-up of schedule and reporting, meetings organization, management of modifications, utilization of opercom system (ICAPS), project management system (Win PCS), CMMS system (Optimis, Mainta, SAP) and material management system (SAP).
Resume created on DoYouBuzz

Lead Electrical and Cathodic Protection Engineer

ILF Beratende Ingenieure GmbH (ILF Consulting Engineers)
October 2011 to July 2012
Almaty
Kazakhstan
  • Review and comment documentation and drawings during basic design phase.
  • Preparation of documents (datasheets, specifications...) as per client requirements.
Detailed Description
  • The Project comprises some 1.400 km of 1,067mm diameter X70 pipeline extending from Beineu-Bozoi and from Bozoi-Shymkent.
    Four new Metering Stations, Nos. 2 Compressor Stations and a SCADA & Telecommunication System will be provided.
    The 1st Phase plans a throughput of 6 bcma – the Bozoi-Shymkent section being planned for completion in 2013. The main facilities of Phase 1 are as follows:
    • Pipeline from Bozoi to Shymkent including all PSR stations in-between and branch line / take off connection for local supply
    • Compressor station CS1 at Bozoi, including Repair - Maintenance – Area (RMA), shift camp and metering station to interconnect to Bukhara – Urals
    • Pig Receiver and Metering station in CS2 / Kereit, Tie-in connection to Kazakhstan – China Gas Pipeline (AGP)
    • Pipeline between CS2 / Kereit and Akbulak / Samsonovka, including pig launcher and receiver
    • Gas Metering Station (GMS) and RMA in Akbulak
    SCADA & Telecom for Stage-1, including station control system for CS1
    The 2nd Phase, planned for completion in 2015, will complete the Beineu-Bozoi section and will add the one compressor station to achieve a throughput of 10 bcma. The main facilities of Phase 2 are as follows:
    • Pipeline from Beineu to Bozoi, including all PSR stations in between, interconnection to Bozoi Compressor Station
    • Gas Metering station (GMS) Beineu
    • Compressor station CS4 Karaosek and RMA Kyzlorda
    • Extension of SCADA & Telecom for Stage-2 pipeline section, including station control system for CS4 and integration of metering station in Beineu
    The 3rd Phase, not yet defined and scheduled, plans a throughput of 15 bcma.
Company Description
The company was founded by Pius Lässer in Innsbruck in 1967. In 1969 he was joined by Adolf Feizlmayr and the company expanded into "Ingenieurgemeinschaft Lässer-Feizlmayr" (ILF). Today, the company does business under the name of ILF Consulting Engineers.

In its more than 40-year long corporate development ILF has continued to extend the scope of its activities and expertise to embrace new and diversified engineering disciplines.
Company website