Your browser is outdated!

To ensure you have the best experience and security possible, update your browser. Update now

×

Sardar Khudhur

Civil Engineer

Unemployed Available
  • The “Water Supply Improvement Project in Kurdistan Region”, commissioned by the General Directorate of Water and Sewerage in Kurdistan Region to Khatib &Alami, the quantity and quality of water supply in Halabja area and Sulaymaniyah City through constructing new water supply facilities, such as water intake, water treatment plants, water transmission
    facilities, distribution networks etc. As a civil engineer – networks, I worked in Sulaimaniya networks which it includes water network in 16 Zones with 5 villages & two transmission lines … My duties in this company is supervising & consulting the activities in some zones. As a Team Leader, I'm supervising two engineers (Inspectors) and one survey engineer.
Learn more
  • In this project I worked as Deputy Project manager for the following Items:
    1. Building 12 multistory building. Each Building has 14 floors , each floor with 4 flats.
    2. Constructing three floors High school.
    3. Constructing Administration building.
    4. Constructing Nursery building
    5. Constructing supermarket.
    6. Constructing car wash and laundry.
    7. Constructing kindergarten building.
    8. Constructing health center.
    9. Constructing sport yard
    10. Extension of power plant.
    11. Infrastructure works including sewerage, potable water, external lighting, firefighting and security System….etc.

    In this project working as deputy project manager carried on my shoulder many duties and responsibilities for coordinating the work activities to ensure the project remains on schedule, within cost, and completing quality work…
Learn more
  • In this project I worked as project manager for the following Items:
    1. Renovating 11 Wooden barracks (temporary barracks) and shower rooms.
    2. Renovating Admin area with tiling.
    3. Building 10 New barracks and multipurpose room.
    4. Constructing Two Pavilions
    5. Constructing 464m2 Warehouse
    6. Building Two Elevated water tanks
    7. Constructing 2Km. length Perimeter lights
    8. Building Maintenance shop
    9. Building Barber shop
    10. Building Library
    11. Constructing Two dining rooms with storage
    12. Fort external wall's cement plastering and painting
    13. Renovation of existing recreation yards
    14. Construction of 12 new recreation yards
    15. Building Two Guard shelters
    16. Fixing roofing tiles system
    17. Providing 3 new generators
    18. Provide T‐walls, pad and roof shade for generators
    19. Construction of 70‐Quad cells in block one
    20. Construction of 26‐Quad cells in block two
    21. Construction of 21‐Quad cells in block three
    22. Construction of 16‐Double cells in SW rotunda
    23. Constructing Receive and discharge area.
    24. Construction of new septic tanks and filling existing tanks.
    25. Construction of manholes with main sewer pipes
    26. Construction of lagoon system and leach lines
    27. Installing 630KVA transformer for outside buildings
    28. Building Medical treatment room.
    29. Access road for new barracks.
Learn more
  • Working as quality control manager is for ensuring that the construction is performed
    according to plans and specifications, on time and within a defined budget. As Quality control manager, I prepared a quality plan for this project and in this plan I prepared many forms, tables and tracker for documenting quality daily reports, submittals, testing and inspecting implementing items, receiving materials and checklist for comparing received materials with approved materials, Initial & preparatory check lists, deficiencies and tracking them, punch list,…..and many other papering works.
Learn more
  • Working as quality control engineer (QC representative) in Suly site. My duties were
    controlling. Inspecting the Items were under implementation which excused by the subcontractor, Preparing Daily reports about the project activities in the site.
Learn more
    1. Working as field inspector (QA/QC representative) in building six clinics in Suly governorate (2 clinics inside Sulaimaniya, and 4 clinics in halabjay Taza, Khurmal, koysenjaq, chemchamal) and I inspected the renovation projects in Pediatric and Maternity Hospitals. My duties were inspecting the Items were under implementation,
    2. Preparing Daily reports about the project activities on the site, sending them to Erbil office by internet.
    3. Preparing preparatory & initial checklists for all new Items in the meeting including all engineers in the site with the subcontractor representatives.
      These checklists were updated by sending them to Erbiloffice. These meeting were supervised by us (as QA/QC representative).
    4. Preparing Concern Reports, Non-onformable log then at last writing a conformable report about the deficiencies, if any deficiency happens... These report & logs were sent by net, at the same day to our office in Erbil. Then
      our manager sending these reports to the construction department for solving the problem and corrective action.
    5. Preparing the checklists for all new Items.
    6. Preparing the punch list for all the finished projects.
    7. Preparing updating for progresses of the Items every week one time.
    8. Working as one team with other departments of our company (Construction, QA/QC, Safety)
Learn more
  • Working as construction engineer in Ministry of Municipality. Main field was as a head of a number of site engineers in 12 sub-municipalities in the following area; Chamchamal, Qaranaw, Takya , Bazyan, Gopala,Bakrago, Rapareen, Tasluga, Shorsh, Baingan ...etc).
    My duty including supervising & inspecting about 100 projects in 12 towns with required breakdowns and making bills of quantities, also writing backgrounds and assessments. The projects including renovation & construction of the following fields:
    • Building and renovating garages and the building of municipalities, cultural centers, & veterinary centers... etc.
    • Building gardens, playground & hotels.
    • Spreading the internal roads & streets by asphalt.
    • Installing water supply net for districts.
    • Building ground & elevated tanks.
    • Sewerage system net for towns.
    • Digging deep wells
    • Pouring the concrete of the sidewalks of the towns.
    • Building retaining walls.

Civil Engineer

Niazy Company
April 1997 to October 1998
Sulaimaniya\Darbandixan
Iraq

Civil Engineer

Ary engineering office
October 1991 to January 1993
Sulaimaniya
Iraq

B.Sc. Civil Engineering

University of Mosul

1987 to 1991
Mosul – Iraq

High School Certificate

Roshinbeer Secondary School

1984 to 1986
High School Certificate, Scientific department
  • Kurdish (Mother Tongue). Excellent Read, write, understanding and speaking
    fluently.
  • Arabic; Excellent Read, write, understanding and speaking fluently
  • English; Excellent Read, write, Good understanding and speaking