Erection supervision, instrumentation installation, electrical cabling and commissioning of a biomass boiler, wet steam (4,5 t/h, 10 bars), in Congo RDC, MILUNA, 2 months in 2017
Erection supervision of a biomass boiler of 14 MWth (wet steam), in Ghana, WILMAR, 3 months in 2016
Commissioning assistant, operator's training, data analyzis and tuning for process regulation stability, maintenance on a biomass boiler 15 MWth, dry steam (60 bars,480°C) with turbine MAN, 3.5 MWe, in France, COGELAND, 18 months from 2014 to 2016
Erection supervision, cabling, commissioning of 3 biomass boiler 8MWth (hot water), in France, MONSANTO, 5 months in 2014
Different interventions as field service/project engineer on biomass boiler plant in France, Moroco, Nigeria, Bangladesh and the Netherlands