¡Tu navegador no está actualizado!

Actualiza tu navegador para garantizar que tienes la mejor experiencia y seguridad posibles. Actualizar ahora

×

Edgar Trujillo Salcedo

Production Engineer

Edgar Trujillo Salcedo
Professional Status
Employed
Open to opportunities
About Me
Master in Industrial Engineering focused on improving productivity, quality and delivery with 3 years in automotive industry looking for innovation and continuous improvement.
Resume created on DoYouBuzz
  • Responsibilities

    1.- Line balancing for Operative Units.
    2.- Calculate headcount considering model mix, constraints, method and machinery.
    3.- Coordination TOS Projects and Continuos Improvement in Production Area related to Quality, Logistics and Assembly.
    4.- Coordinate for Production Direction R2L's initiatives and Roadmap assuring process needs are met or improved.
    5.- Improve and validate Standard Work Instruction and Job Element Sheet (Standardized Work).
    6.- Calculate and keep on updated labor standard time for direct head count in team with DTNA.
    7.- Oversee Top KPI's for Production Director and Plant Manager (TPT, OTD, HPV, Uptime, Production Volume, Overtime, etc)
    8.- Coordinate preseries and change over between Support Units and Operative Units assuring M's in order to avoid production issues.

    Projects/Achievements

    1.- Increase Value Added from 35 % to 63 % on Assembly Lines using Lean Manufacturing.
    2.- CI projects in Engine Line, Final Chassis and Final Cab improving 50 % scrap,30 % cycle time, 30 % quality issues, safety and ergonomic conditions in 80 % defining method, delivery of materials, machinary and equipment.
    3.- Line balancing for Operative Units during launching 3rd shift using Yamazumi tool.
    4.- Improve productivity from 115 HPVs to 103.3 HPVs.
    5.- Implementation of SPC and Digital PPAF for torques in the area Sub-assemblies Engine Line.
    6.- Leader in planning and launching 3rd Shift for the whole plant related to manpower, machinery and equipment, material and method.
    7.- Responsible updating SWI's, JES and Line Balancing for new Cascadia Model in Santiago TMP.
    8.- Economic Savings from 2013 to 2016 by more than $500,000 USD implementing R2L projects.
    9.- OTD was improved from 80 % to 93 % using techniques such as VSM, PPS and Visual Management in team with Logistics, Engineering, Quality and Offline.
    10.- Improvements in variables cost getting better solutions, designs and suppliers with savings by almost $350,000 USD.