Electrical Engineer with 6 years’ Experiences in Execution Projects from Development to Delivery Encompassing Construction of New Projects, Renovation Works and Fast Track Projects, Held Several Positions such as Site, T.O. and QC Electrical Engineer. Have excellent Experience in all stages of Project Execution from infrastructural stage, Finishing Works and the testing and commissioning stage. Have Good Experience in Construction of office buildings, Residential, Hospital and Power Plants.
Orascom Construction Industries (New Assuit 8x125MW Fast Track simple cycle power Plant project)
Since May 2015
Full-time
Assuit
Egypt
Leading team of two junior engineers and five inspectors at the following
Inspect all electrical works in site and make sure it complies with drawings. Specs. And wiring diagrams
walk down with the owner and Prepare Punch list
Testing equipment at site such as electrical panels, Transformers, GCB, Generators and Motors
Review and test all cables (MV, LV, control (including DCS) and instrumentation cables) and make sure it is connected correctly according to wiring diagrams, cable list and SLD
Participate with commissioning team in first fire for the turbines, back energize, HV Testing for GIPs and Operate central Control MV switchgear
Testing and troubleshooting for heat tracing and cathodes protection systems
Testing motors and equipment at fuel Tanks stationand water treatment station
Hi pot voltage test on panels Bus bars and MV Cables
Following HV Cables erection
Prepare Turn over packages TOP with all required documentation Such as (equipment test certificate, Cable testing sheets, equipment manuals…. etc.)
Orascom Construction Industries (AS-SALAM International HospitalRenovation, El Maadi)
July 2014
to May 2015
Full-time
Cairo
Egypt
Inspect and review all electrical works in site and make sure it is comply with shopdrawings standards, specifications and project requirements for the following systems
Power, Lighting and Earthing systems
Electrical requirements for Medical equipment areas such as(Simulator, Linear accelerator, CSSD,intensive care, Patient and operations rooms)
Light current systems (Telephone, Data, Fire alarm, Firefighting (FM200 & CO2), Building management system (BMS), Public address, Nurse calling, Access and security, Master clock and satellite
Orascom Construction Industries (BAIJI Gas Power Plant 6x160MW
February 2013
to July 2014
Full-time
Salah Edin
Iraq
Manage work operation involving erection and installation for Gas turbine (type SGT5-2000E (CO)) central control building & switch gear with the following activities
• All turbine skids (lube oil, Fuel Oil, Turning Gear, Hydraulic, Exhaust Gas, Air intake & Fin fan cooler)
• Black Start and Emergency Diesel Generators
• MV and LV switch gear panels with Megger and hi-pot test for all cables and panels before connection
• DCS system including pulling and connection of control cable
• Electrical installation for Power control center (PCC), Main Generator (15.7KV) and Isolated Phase Bus Duct (IPB)
• Filling H.V Bus Ducts with SF6 Gas
• M.V installation and Transformers Testing
• Heat tracing system
• Installation of instruments, Cable laying, conduit installation, Hook up inst. for the following devices (pressure transmitter, temp. element thermo- coupler, vibro-meter , humming, tribune speed, IGV limit switch,Flame monitor, accelerometer, and continues emission monitoring system ..etc.,
Orascom Construction Industries (MIVIDA Villas Project -Parcel 5 )
October 2011
to February 2013
Full-time
Cairo
Egypt
Manage work operation involving erection, installation, testing and commissioning for the following activities
Power and Lighting systems
Medium and Low voltage system including RMU, Transformer, Emergency Generator, MDB, ATS, UPS, Sub-Panels ….etc.
Light current systems (Telephone, Data, Fire alarm, Firefighting (FM200 & CO2), Building management system (BMS), Public address, Access and security, Master clock and satellite
Orascom Construction Industries (Housing and Development Bank Headquarters Building, 5th settlement)
August 2010
to October 2011
Full-time
Cairo
Egypt
Manage work operation involving erection, installation, testing and commissioning for the following activities
• Power and Lighting systems
• Medium and Low voltage system including RMU, Transformer, Emergency Generator, MDB, ATS, UPS, Sub-Panels ….etc.
• Light current systems (Telephone, Data, Fire alarm, Firefighting (FM200 & CO2), Building management system (BMS), Public address, Access and security, Master clock and satellite