Hard-working student with technical and problem solving skills and the ability to learn concepts quickly.looking to apply my education and experience to a job in industrial engineering . Areas of proficiency include quality control, production control,simulation and data analysis.
The aim of this project was to improve the productivity by minimizing the time required to perform the tasks and to conserve resource as well as to minimize cost by determining the most appropriate direct and indirect material-fed for the production of goods considering the cost and availability of power. In addition, to maximize the safety, health and welfare of all employees.
We achieved our objectives using the time and motion study and by implementing ergonomics measurement methods