Civil Engineering General Rating : very Good Graduation project: Structural Analysis Graduation project Rating : Excellent
PROFESSIONAL PROGRAMS (PRMG)
The American University In Cairo
2017
to 2019
Project Management Professional Program
PROFESSIONAL PROGRAMS (EVEN)
The American Universaity In Cairo
2017
to 2018
Environmental Engineering Diploma
MASTERS IN ENVIRONMENTAL AND SANITARY ENGINEERING
FACULTY OF ENGINEERING CAIRO UNIVERSITY
Since 2019
Experiences
Senior Design and Technical Engineer (Design, Supervision and Technical support)
Orascom Construction
Since 2022
Project Wave - Mirfa (Abu Dhabi, united Arab) Design and technical support for desalination plant 115MIGD and transportation facilities.
Design and technical support Al wathpa STP polishing plant 700,000 m3/d in Abu Dhabi Design WPP, pump station and transmission pipelines.
Al Basra water project, Iraq consulting service Design and technical support for desalination plant 1 M m3/d and water transmission system consisting of pumping station and pipeline network.
Rayis - Rabigh IWTP (Kingdom of Saudi Arabia)
Senior Infrastructure and Hydraulic Engineer
International Office for Water & Environmental Studies
Since January 2021
Preparing technical and financial offer of water and wastewater treatment plants, pump stations, force mains, and water and wastewater networks.
Design of wastewater treatment plants including design of treatment units, layouts, hydraulic profiles, details of treatment units, treated effluent pump stations and force mains
Design of water treatment plants including design of treatment units, layouts, hydraulic proles, details of treatment units, treated effluent pump stations and force mains
Design of pump stations and force mains
Design of water and sewage networks
Senior Infrastructure and Hydraulic Engineer
Egyptian Group for Engineering consultants
Since July 2017
Project Manager (infrastructure project)
Buraydah 2 TSE special facilities and transmission pipelines, Saudi Arabia
Madinah 3 TSE special facilities and transmission pipelines, Saudi Arabia
Water desalination plant and water transmission pipelines, Basra, Iraq
Preparing technical and financial offer of water and wastewater treatment plants, pump stations, force mains, and water and wastewater networks.
Design of water and sewage networks.
Design of pump stations and transmission Lines.
Design of water treatment plants including design of treatment units, layouts, hydraulic profiles, details of treatment units, treated effluent pump stations and force mains.
Design of wastewater treatment plants including design of treatment units, layouts, hydraulic profiles, details of treatment units, treated effluent pump stations and transmission lines.
Transient Analysis study and Design of hammer protection systems.
Doing environmental impact assessment reports:
Environmental impact study of sewage networks, pump stations, transmission lines water and waste water treatment plant
Project management and planning for infra works.
Design of sanitary landfills including (gas and leachate collection systems, cover layers and liners.
Senior Infrastructure and Hydraulic Engineer
Infra Misr for Engineering consultants
2019
to 2021
Part-time
Hydraulic designs, stress analysis and Transient Analysis studies
Sewage, Water and irrigation networks
El-Maziona, Dhofar governorate, Oman
Senior Design engineer (out source)
Civil Engineering Research and Studies Center of Cairo University
2019
to 2020
Design of sanitary landfills including (gas and leachate collection systems, cover layers and liners):
Aniza landfill, Al-Qassim , Saudi Arabia
Al-Sadat landfill, Monofia, Egypt
Hydraulic designs, stress analysis and Transient Analysis studies
Senior Infrastructure engineer (design and supervision)
Madkour Group for Engineering consultants
2021
to 2022
Freelancer
Hydraulic designs, stress analysis, Transient studies and Design of Hammer Protection Systems for National project of Toshkia Aswan, Egypt
Senior Infrastructure engineer (design and supervision)
Petrojet company
Since 2020
Freelancer
Hydraulic designs, stress analysis, Transient studies and Design of Hammer Protection Systems of water pipelines serving the ASORC and ANOPC utilities of the petroleum company
Summer Training
Armed Forces
July 2016
to September 2016
The project consisted of three phases:
First phase was located in an area of 584 acres
Second phase was located in an area of 242 acres
Third phase was located in an area of 277 acres .
Summer Training
Mena Group for Constructions and Trading
August 2015
to September 2015
The training was in MENA TRADE CENTER in El-Ibrahimya which is a commercial building that embraces two administration floors, retail stores with different spaces and a garage that accommodates up to 100 cars.