RABYA FOR TRADING AND AGRICULTURE RPD (RUSH PROJECT DIVISION)
Since August 2011
Full-time
Abha
Saudi Arabia
400-BED PSYCHIATRIC HOSPITAL MEDICAL CITY IN ASSER ABHA
PROJECT BUDGET 664,000,000SR
Duties:
Following up material submittals with technical office.
Following up shope drawing approvals with technical office.
Incharge for Supervision of architectural works.
Ensured that all the works done are in accordance with the approved construction drawings, contract documents, project specifications.
Responsible for as built drawings.
Islamic University fence & gates Islamic University fence & gates ISLAMIC UNIVERSITY MADINAH AL MUNAWARA
PROJECT BUDGET 55,000.000SR Precast Buildings
Duties:
Following up material submittals with consultant .
Following up shope drawing approvals with technical office.
Responsible for material tackoff.
Incharge for Supervision of architectural works in site .
Ensured that all the works done are in accordance with the approved construction drawings, contract documents, project specifications.
Responsible for as built drawings.
FIVE NEW LABORATORIES BUILDINGS PROJECT FOR ENGINEERING COLLEGE ISLAMIC UNIVERSITY MADINAH AL MUNAWARA
PROJECT BUDGET 114,000.000SR
Duties:
Take part in shope drawing approvals with consultant.
Ensured that all site works are done according to all applicable quality standards.
Reviewed materials and equipment to ensure that they are in accordance with the specifications.
Provided solutions for design problems to meet site requirments .
Ensured that all the works done are in accordance with the approved constructio drawings, contract documents, project specifications.
Responsible for as built drawings.
WORK EXPERIENCE IN EGYPT
Worked in Benaa Office for Architecture (from 1/7/2010 to 1/6/2010) Worked as Design Engineer
Architectural designs work for many villas
Shop drawing work for many villas
TRAINIG .
Summer2009: Training in Benaa office for Architecture Designs (from 15/7/2009 to 15/11/2009)
Architectural Assistant ▪ Business logistics in the office, the work of supervision in site, maps licenses, maps design, implementation, construction, mechanics, electricity, sanitary, and other sections, elevations and finally to external perspectives with 3D AutoCAD Summer2008: Training in El-Zyat office for Engineering Designs (from 15/7/2008 to 15/12/2008)
Architectural Assistant ▪ Business logistics in the office, the work of supervision in site, maps licenses, maps design, implementation, construction, mechanics, electricity, sanitary, and other sections, elevations and finally to external perspectives with 3D AutoCAD Summer2007: Training in El-Sarh Office for Engineering Designs (from 15/7/2007 to 15/10/2007) Architectural Assistant ▪ Business logistics in the office, the work of supervision in site, maps licenses, maps design, implementation, construction, mechanics, electricity, sanitary, and other sections, elevations and finally to external perspectives with 3D AutoCAD .