¡Tu navegador no está actualizado!

Actualiza tu navegador para garantizar que tienes la mejor experiencia y seguridad posibles. Actualizar ahora

×

Edgar Trujillo Salcedo

Production Engineer

Edgar Trujillo Salcedo
Professional Status
Employed
Open to opportunities
About Me
Master in Industrial Engineering focused on improving productivity, quality and delivery with 3 years in automotive industry looking for innovation and continuous improvement.
Resume created on DoYouBuzz
  • Responsibilities

    1.- Line balancing for Operative Units.
    2.- Calculate headcount considering model mix, constraints, method and machinery.
    3.- Coordination TOS Projects and Continuos Improvement in Production Area related to Quality, Logistics and Assembly.
    4.- Coordinate for Production Direction R2L's initiatives and Roadmap assuring process needs are met or improved.
    5.- Improve and validate Standard Work Instruction and Job Element Sheet (Standardized Work).
    6.- Calculate and keep on updated labor standard time for direct head count in team with DTNA.
    7.- Oversee Top KPI's for Production Director and Plant Manager (TPT, OTD, HPV, Uptime, Production Volume, Overtime, etc)
    8.- Coordinate preseries and change over between Support Units and Operative Units assuring M's in order to avoid production issues.

    Projects/Achievements

    1.- Increase Value Added from 35 % to 63 % on Assembly Lines using Lean Manufacturing.
    2.- CI projects in Engine Line, Final Chassis and Final Cab improving 50 % scrap,30 % cycle time, 30 % quality issues, safety and ergonomic conditions in 80 % defining method, delivery of materials, machinary and equipment.
    3.- Line balancing for Operative Units during launching 3rd shift using Yamazumi tool.
    4.- Improve productivity from 115 HPVs to 103.3 HPVs.
    5.- Implementation of SPC and Digital PPAF for torques in the area Sub-assemblies Engine Line.
    6.- Leader in planning and launching 3rd Shift for the whole plant related to manpower, machinery and equipment, material and method.
    7.- Responsible updating SWI's, JES and Line Balancing for new Cascadia Model in Santiago TMP.
    8.- Economic Savings from 2013 to 2016 by more than $500,000 USD implementing R2L projects.
    9.- OTD was improved from 80 % to 93 % using techniques such as VSM, PPS and Visual Management in team with Logistics, Engineering, Quality and Offline.
    10.- Improvements in variables cost getting better solutions, designs and suppliers with savings by almost $350,000 USD.
  • Design and implement new optimized process into blowing area achieving annual savings by almost $2,000,00 MXN.

    Using Standardized Work, eliminating wastes mainly waitings and walikings, combining workstations work and defining a process improving consume of electricity.
Learn more
  • Generate and implement robust process to generate data books for major customers reducing lead time in 50 % and eliminating customers penalties in more than $150,000 USD.
  • English
    Advanced
  • Excel
    Expert
  • Word
    Expert
  • Power Point
    Expert
  • Access
    Good
  • Minitab
    Expert
  • Visio
    Expert
  • Plant Simulation
    Good
  • Stella
    Good
  • Palisade Decision Tools
    Expert
  • SAP
    Notions
  • AutoCAD
    Notions
  • Visual Basic
    Good
  • Lean Manufacturing
    Advanced
  • Six Sigma
    Advanced
  • Production Planning and Control
    Training by Ex Toyotas
    Expert
  • Problem Solving Process
    Expert
  • TRIZ
    Advanced
  • Simulation
    Plant Simulation and Stella
    Expert
  • Making decisions
    Advanced
  • Quality Systems
    ISO
    Advanced
  • SPC
    Good
  • Delivery Methods - Logistics

Master Degree in Industrial Engineering

Instituto Tecnologico de Orizaba

2010 to 2013
Optimization and Making Decisions

Bachelor in Industrial Engineering

Instituto Tecnologico de Orizaba

2005 to 2009
Quality and Productivity